The timber frame started to go up yesterday with the floor joists being constructed.
Luckily, the electrical fiasco came to an end when I talked to the boss of the inspector that gave me such a problem last week. I told him that I had fixed the deficiencies that were notated by the inspector and was wondering whether he would be up this Thursday or not for a final inspection. He said that since I was the only inspection up here in North Park, that they would not be up this week and that since that was the case, he would pass the inspection on a temp basis until they came up here. He called Mt Parks Electric and released the job so the meter could be installed. Joe Lance of Mt Parks came over about 2PM and installed the meter (3333) and we were in like flint!
The first day the crew installed the rim joists, the floor joists and the OSB flooring.
Day two was the raising of the bents. Because some of the wood twisted and shrank the center bent was a challenge, but it all got done and by the end of the day two of the bents were done and the ridge beam set. Since Joe works 4 10's they went home to return on Monday to finish the frame.
Below are some pictures of the progress. If you want to see all of the pictures take a look at:
http://gallery.me.com/nshoffner#100207
Thursday, August 07, 2008